Schedule a demo
Applications / Control Rooms & Nuclear

A missed indicator is
not a usability finding.

In nuclear operations, power generation, and process control, an alarm that goes unseen is a safety event. Attention data turns that risk into something you can measure before it happens.

Where it contributes

ALARMS

Alarm handling

Whether an indicator was actually looked at, how long it took, and what the operator was attending to instead.

LAYOUT

Panel & display design

How attention distributes across a wall of screens, and where a layout leaves gaps.

SHIFTS

Workload & fatigue

Pupil and blink dynamics across a shift, as objective supporting evidence for staffing and procedure decisions.

Why our systems fit this

Built in MassachusettsUS-owned, US-based engineering and fabrication
ITAR cleanclean export-compliance record, trusted worldwide
40 years in the fieldfrom cockpits to operating rooms

Evaluating a control room?

Tell us about the environment and we will scope the study.

Start a conversation